Solar PV + Substation + HV Line48 MWp

Barcos Photovoltaic Plant

Client / DeveloperAquila Clean Energy
LocationTabuaço, Viseu, Portugal
Timeline2023 - 2025
Total Area55 hectares (Zonas A, B, C e D)

Project Overview

The Barcos Solar Plant features 48 MWp capacity with 84,952 Trina Solar bifacial modules (565 & 570 Wp), 154 Huawei 330 kVA string inverters, and 7 x 6,000 kVA transformer stations. Energy evacuation is handled by a 30/60 kV substation (50 MVA Siemens transformer) and 4.6 km hybrid transmission line (3.6 km overhead + 1.0 km underground) connecting to the REN national transmission grid.

Technical Specifications

PV Modules84.952 unidades Trina Solar Bifaciais
Inverters154 x Huawei SUN2000-330KTL-H1 (330 kVA)
Transformer Stations7 x 6.000 kVA
Substation30/60 kV com Transformador 50 MVA Siemens
HV Transmission Line4,6 km (3,6 km aéreos + 1 km subterrâneo)
Total Cabling143.786 m DC · 67.192 m AC · 5.492 m MT
Total Area55 hectares

Scope of Work & Activities

  • Technical audit and validation of all detailed engineering designs;
  • Full civil works, internal roads and structural foundations oversight;
  • Quality control of module installation, inverters and transformer stations;
  • Inspection and testing of the grid-interconnection HV transmission line;
  • Oversight of cold and hot commissioning procedures;
  • Commercial energization validation and Grid Code compliance testing.

Services Rendered:

Full-Time Site SupervisionDesign Engineering Review